Thursday, 31 August 2017

The Garden Railway resurfaces!

After a long discussion with the landlords, it's finally happened! A permanent line has appeared in my garden. Only about 22ft long at the moment but will grow to 30ft on Saturday with further growth potentially following in the new year if it beds in enough and the parents are still happy.


First job, go and buy a load of Ballast. Phase 1 used 6 bags and I have 4 more in stock for phase 2/3 if it ever happens.


Ballast down and in place. Taken just before it was packed (aka stood on)


Track all laid and tamped. Ready for running (and yes, the trains do fit under the slab)


The kinds of shots that are now possible. Leader shown at the end of the line. That's SO much better compared to the rotten planks the line was on before.

Overall, I'm very happy with the end result and I'm looking forward to getting it finished and test trains run on Saturday! That and finally being able to dispose of the rotten boards the line used to live on!

No comments:

Post a Comment