Tuesday, 3 April 2012

BLR - Some progress at last

At last some progress on the BLR project. After a lot of thought, the line has been transformed from a out and back to a continuous loop of track. At the moment, its roughly laid on the back lawn which makes running a challenage due to the gradients involved in the line.

The line as it is atm



However, I do have plans to make this loop line longer. As shown below. Although its only adding a couple of S bends into the line, it should make things more interesting when operating it. Hopefully, I'll be able to aqquire some addition 45mm stock (see wish list) to run with the steam loco and hopefully a second engine/railcar to run on days when I just want to watch the trains run.



As usual, comments and suggestions about future rolling stock are always welcome.

Until next time,

Jon

No comments: