Friday, 12 July 2013

Its been awhile, a long while

Its been awhile, a long while since I last posted anything on this blog. That doesn't mean there hasn't been any work on my many layouts though. Since my last post, I've disposed of 2 layouts (Doveston and Blaencwm Works) and built two new ones (Billington Road and Dovington). Both the new layouts are DCC controlled using Hornby and Bachmann control systems respectively.
 
Below, are a selection of photographs of the two new layouts for now although the Pages on the contents bar will be updated with better infomation on both projects.
 
Dovington
 
 
 
 

Billington Road
 
 


 
Cheers,
 
Jon