To Do list

As its always nice to have a list of things that need doing, here's mine:

Blaencwm-

Detailing - Station Name, Passengers etc

BLR-

Locate a proper base for the line to sit in/run on

DCC Layout OO-

Continuing testing of the DCC aspects and look into DCC point control

Stock - 009

Paint the L&BR Goods set in SR Brown

Stock - 00

Fix/repair all stock
Fit appropiate Headcodes to all engines
Chip all DCC ready engines and work though the rest of the fleet that needs chipping

Stock - 45mm G45

Finish VoF
Finish Carriages 1, 2 and WHHR No.6
Test run L&B stock with Ezee Brake Van