As its always nice to have a list of things that need doing, here's mine:
Blaencwm-
Detailing - Station Name, Passengers etc
BLR-
Locate a proper base for the line to sit in/run on
DCC Layout OO-
Continuing testing of the DCC aspects and look into DCC point control
Stock - 009
Paint the L&BR Goods set in SR Brown
Stock - 00
Fix/repair all stock
Fit appropiate Headcodes to all engines
Chip all DCC ready engines and work though the rest of the fleet that needs chipping
Stock - 45mm G45
Finish VoF
Finish Carriages 1, 2 and WHHR No.6
Test run L&B stock with Ezee Brake Van